Foundations dug, concrete poured, sub-base brickwork and the roof stage: an autumn 2025 extension in St Neots.

Laying the groundwork is one of the most important parts of any build. This local rear extension in autumn 2025 shows why.

Solid foundations

  • Foundations dug: precision excavation to ensure stability
  • Concrete poured: strong, durable and built to last
  • Sub-base brickwork completed, ready to support the next phase

The foundations were dug, checked and poured, then the sub-base brickwork was built up step by step. A solid sub-base floor means better stability, durability and peace of mind for everything that follows.

The roof stage

By December the roof was going on, beginning to define the shape and character of the new space and how it sits with the existing house.